How much of a deposit should I ask for before I start a remodel?

Ask for enough to cover your material buy and the first days of labor, then bill the rest in draws tied to finished stages. Some states cap deposits on home improvement contracts, so check with your state board first.

A deposit is not profit. It's there so you're not floating the customer's materials out of your own pocket. Size it off what you actually spend up front: the material order, the dumpster, the permit, and the first days of labor. After that, stop thinking about one big number and start thinking in draws. Write the draw schedule into the contract before anybody signs, and tie each draw to something the customer can walk up and see: demo done, rough-in passed, cabinets set, paint complete. Never tie a draw to a date. Dates slip, walls don't. Two rules that save fights. One, no draw is due for work you haven't finished. Two, the customer never owes more than the work standing in front of them, and you never have more work standing there than you've been paid for. Some states put a hard cap on what you can collect up front on a residential job, and some require specific wording in the contract. That varies by state, so check with your state licensing board or your attorney before you settle on your standard contract.

¿Cuánto anticipo debo pedir antes de empezar un remodelado?

Pide lo suficiente para cubrir el material y los primeros días de mano de obra. Lo demás cóbralo por avances, cada pago amarrado a una etapa terminada. Algunos estados limitan el anticipo en casa habitación; confirma con la junta de tu estado.

El anticipo no es ganancia. Es para que no andes financiando el trabajo con tu propio dinero. Sácalo de lo que de verdad gastas al principio: el pedido de material, el permiso, el dumpster y los primeros días de la cuadrilla. Después deja de pensar en un solo pago grande y piensa en avances. Escribe el calendario de pagos en el contrato antes de que alguien firme, y amarra cada pago a algo que el cliente pueda ver caminando la casa: demolición terminada, rough-in aprobado, gabinetes puestos, pintura lista. Nunca amarres un pago a una fecha. Las fechas se mueven, las paredes no. Dos reglas que te ahorran pleitos. Una, no se cobra un avance por trabajo que todavía no terminas. Dos, el cliente nunca te debe más de lo que ya está hecho, y tú nunca tienes hecho más de lo que ya te pagaron. Que siempre vayan parejos. Hay estados que ponen tope a lo que puedes cobrar por adelantado en casa habitación, y otros exigen texto específico en el contrato. Eso cambia según el estado: pregúntale a la junta de licencias de tu estado o a tu abogado antes de armar tu contrato.

The customer wants extra work but doesn't want to sign a change order. What do I do?

Don't do the work until it's in writing. Price the extra, put on paper what it costs and how many days it adds, and get a yes you can show later. A text with the price and "ok" counts as writing.

Free work never stays free. It becomes the new standard. The minute the scope changes, the job changes, and the paperwork has to change with it. Keep it simple. Three lines: what the extra work is, what it costs, how many days it adds to the schedule. Hand it over before a tool comes out of the truck. Most customers aren't trying to rob you. They just don't picture that moving a wall means new electrical, new drywall, new paint and another inspection. If they won't sign, don't argue and don't get loud. Use the same sentence every time: "I can absolutely do that. Here's the price, and I need a yes in writing before I start." Then stop talking and let the quiet do the work. Written doesn't have to mean a lawyer's form. An emailed line item, a text with the price and "go ahead," a photo of the signed page. Any of it beats memory six weeks later when you're both standing in the driveway telling two different stories. What a change order has to say on residential work, and whether it has to be signed, can be set by state rules. That varies by state, so run your standard form past your state licensing board or an attorney once.

El cliente quiere trabajo extra pero no quiere firmar la orden de cambio. ¿Qué hago?

No hagas el trabajo hasta tenerlo por escrito. Ponle precio al extra, anota cuántos días agrega y consigue un sí que puedas enseñar después. Un mensaje de texto con el precio y un "órale" cuenta como escrito.

El trabajo regalado nunca se queda en regalado. Se vuelve la costumbre. En el momento en que cambia el alcance, cambia la chamba, y el papel tiene que cambiar también. Hazlo sencillo. Tres renglones: qué es el trabajo extra, cuánto cuesta, cuántos días agrega. Entrégalo antes de bajar una herramienta de la troca. La mayoría de los clientes no te quiere robar; nomás no se imagina que mover una pared trae eléctrico nuevo, drywall nuevo, pintura y otra inspección. Si no quiere firmar, no discutas ni levantes la voz. Usa siempre la misma frase: "Claro que se lo hago. Este es el precio, y necesito su sí por escrito antes de empezar." Y ahí te callas. Deja que el silencio trabaje. Por escrito no quiere decir formato de abogado. Un correo con el renglón y el precio, un mensaje con "dale", una foto de la hoja firmada. Cualquiera de esos le gana a la memoria seis semanas después, cuando cada quien se acuerda distinto. Lo que debe traer una orden de cambio en casa habitación, y si tiene que ir firmada, lo pueden marcar las reglas de tu estado. Eso cambia por estado: enseña tu formato una vez a la junta de licencias o a un abogado.

What does retainage mean on a contract and when do I actually get that money?

Retainage is a percentage of every payment that the customer or GC holds back until the whole job is done and accepted. It's your money, just paid late. Your contract sets the percentage and when it gets released.

Retainage shows up mostly on commercial and public work, and on bigger residential jobs where a GC is over you. Every progress payment comes in short by that percentage, and the held money sits until the job is complete and accepted. Three things to do about it. First, price it in. If a slice of every payment is going to sit for months, your cash plan has to survive without it. Second, know the exact release trigger. Read the contract and find the words: substantial completion, final acceptance, punch list closed, as-builts delivered, warranty letter turned in. Whatever it says is what you have to produce to get paid. Third, hold the same retainage on your subs that's being held on you. If you pay them in full while you're getting held, you're the bank. Chase it before it goes cold. The same week you close out punch list, send the closeout package and the retainage invoice together. Sit quiet for three months and it turns into somebody's forgotten line item. Public work often has state rules on how much retainage is allowed and how fast it has to be released. That varies by state, so check your state's rules or ask your attorney.

¿Qué es la retención (retainage) en un contrato y cuándo me pagan ese dinero?

La retención es un porcentaje de cada pago que el cliente o el contratista general te guarda hasta que la obra esté terminada y aceptada. Es tu dinero, nada más tarde. El contrato dice el porcentaje y cuándo lo sueltan.

La retención se ve sobre todo en obra comercial y pública, y en trabajos residenciales grandes donde hay un contratista general arriba de ti. Cada pago te llega corto por ese porcentaje, y ese dinero se queda parado hasta que la obra esté terminada y aceptada. Tres cosas que hacer. Primero, métela en el precio. Si una tajada de cada pago se va a quedar parada meses, tu flujo tiene que aguantar sin ella. Segundo, aprende exactamente qué destraba el pago. Lee el contrato y busca las palabras: terminación sustancial, aceptación final, lista de pendientes cerrada, planos as-built entregados, carta de garantía. Lo que diga ahí es lo que tienes que entregar para cobrar. Tercero, retén lo mismo a tus subcontratistas que lo que te retienen a ti. Si tú les pagas completo mientras a ti te guardan, tú eres el banco. Cóbrala antes de que se enfríe. La misma semana que cierras pendientes, manda el paquete de cierre junto con la factura de la retención. Si te quedas callado tres meses, se vuelve un renglón olvidado que nadie quiere firmar. En obra pública muchos estados tienen reglas sobre cuánto se puede retener y en cuánto tiempo se libera. Eso cambia por estado: revísalo o pregúntale a tu abogado.

How do I run a punch list so the job actually closes out instead of dragging on?

Walk the job with the customer, write every item in one list with a room and a photo, and get them to confirm the list is complete. Nothing gets added after. Then work it in one push and get a sign-off.

A punch list either closes a job or drags it out for two months. The difference is whether there's one list or a running list. Do the walk with the customer, not for them. Bring a light. Go room by room in the same order every time, and write every item down where they can see you writing it. Each item gets three things: the room, what's wrong, and a photo. "Touch up paint" means nothing three weeks later. "Master bedroom, east wall, roller mark above the outlet" with a photo means one guy fixes it on one trip. When the walk is over, say it out loud: this is the list, we're closing it now. Then send it to them the same day and ask them to confirm it. That confirmation is what stops item forty-one from showing up after you thought you were finished. Then work it in one push instead of one-offs. Order any parts first, book a single day, bring the crew, do the whole list, and get the sign-off before the trucks leave the street. BuildPilot saves those walkthrough photos to the phone first, so a basement with no signal doesn't cost you the list.

¿Cómo manejo la lista de pendientes para de veras cerrar el trabajo y no andar regresando?

Camina la obra con el cliente, apunta cada detalle en una sola lista con el cuarto y una foto, y que te confirme que ahí está todo. Después ya no se agrega nada. Luego la trabajas completa y pides la firma.

La lista de pendientes cierra el trabajo o te lo alarga dos meses. La diferencia es si hay una sola lista o una lista que nunca para de crecer. Camina la casa con el cliente, no por él. Lleva lámpara. Ve cuarto por cuarto en el mismo orden siempre, y apunta cada cosa enfrente de él, que te vea escribir. Cada renglón lleva tres datos: el cuarto, qué está mal y una foto. "Retocar pintura" no dice nada tres semanas después. "Recámara principal, pared este, marca de rodillo arriba del contacto" con foto es un muchacho, un viaje y ya. Cuando termines la vuelta, dilo en voz alta: esta es la lista y aquí la cerramos. Mándasela ese mismo día y pídele que te la confirme. Esa confirmación es lo que evita que aparezca el pendiente número cuarenta y uno cuando ya te creías terminado. Luego trabájala de un jalón, no de a poquito. Pide primero las piezas, agenda un día, lleva a la cuadrilla, acaba toda la lista y consigue la firma antes de que las trocas se vayan de la calle. BuildPilot guarda esas fotos primero en el teléfono, así que un sótano sin señal no te tumba la lista.

The customer won't pay the final payment on the remodel. What can I do?

Stop work and send one clear invoice showing the balance, the dates, and photos of what's finished. If that doesn't move it, contractors generally have lien rights, but the notice deadlines are strict and vary by state, so call an attorney fast.

First, make sure it's a payment problem and not a quality problem. Ask straight out: "Is there something on the job you're not happy with?" If there is, go fix it today. A small punch item is the cheapest thing you'll ever buy back. If the work is done and they simply aren't paying, get organized instead of angry. Put the balance, the dates, the change orders they approved, and photos of the finished work into one document. Send one invoice with a specific due date. Save every text and email. Don't go rip your work back out, and don't post about them online. Both turn your good case into their case. Contractors generally have lien rights, and depending on the amount there may be a small claims option too. Both come with hard deadlines and notice requirements that are different in every state. Some states want a preliminary notice at the start of the job, not the end, so the clock may have started months ago. That varies by state, so talk to an attorney or your state licensing board. An invoice that shows exactly how to pay, whether that's Zelle, Venmo, Cash App, PayPal, check or bank transfer, takes away the easiest excuse. BuildPilot puts those options on the invoice and never touches the money itself.

El cliente no me quiere pagar el último pago del remodelado. ¿Qué puedo hacer?

Para el trabajo y manda una sola factura clara con el saldo, las fechas y fotos de lo terminado. Si aun así no pagan, normalmente existe el derecho al lien, pero los plazos son estrictos y cambian por estado: busca abogado rápido.

Primero asegúrate de que sea problema de pago y no de calidad. Pregúntalo derecho: "¿Hay algo del trabajo que no le haya gustado?" Si sí lo hay, ve y arréglalo hoy. Un detalle chico es lo más barato que vas a comprar en tu vida. Si el trabajo está hecho y nomás no pagan, ponte ordenado en lugar de enojado. Junta en un solo documento el saldo, las fechas, las órdenes de cambio que aprobaron y fotos del trabajo terminado. Manda una sola factura con fecha de vencimiento clara. Guarda cada mensaje y cada correo. No vayas a quitar tu trabajo y no los quemes en redes. Las dos cosas convierten tu buen caso en el caso de ellos. El contratista normalmente tiene derecho a poner un lien, y según el monto también existe la corte de reclamos menores. Los dos traen plazos duros y avisos obligatorios, y son distintos en cada estado. Hay estados que piden un aviso preliminar al empezar la obra, no al final, así que el reloj pudo haber arrancado hace meses. Eso cambia por estado: habla con un abogado o con la junta de licencias de tu estado. Una factura que enseña cómo pagar (Zelle, Venmo, Cash App, PayPal, cheque o transferencia) le quita la excusa más fácil. BuildPilot pone esas opciones en la factura y nunca toca el dinero.

How do I stop a remodel from turning into a pile of free extra work?

Write down exactly what's included and what isn't before you start, and say no the first time, not the fifth. Every "while you're here" gets a price and a written yes, even the small ones.

Scope creep is never one big request. It's twenty small ones, and each one sounds reasonable by itself. Kill it in the contract first. Write an included list and a not-included list. The not-included list is the one that saves you: appliance hookups, hauling off the old fence, moving furniture, painting ceilings, patching where the customer's own guy tore something out. If it isn't written down, the customer assumes it's in there, and honestly, why wouldn't they. Then hold the line on day one. The first "while you're here, can you just..." sets the tone for the whole job. You're not saying no to the work. You're saying yes to the work at a price: "Yeah, I can do that. Let me get you a number tonight." That one sentence turns a favor into a job. Watch the small stuff too. Ten minutes here and twenty there adds up to crew hours nobody is paying for. Track them on one job and you'll never look at them the same way. And tell your lead man the same rule. A lot of free work never gets promised by the owner. It gets promised by a foreman being polite while you're across town. What your contract has to spell out on residential work varies by state, so have an attorney or your state board read your form once.

¿Cómo evito que un remodelado se convierta en un montón de trabajo extra regalado?

Deja por escrito qué incluye y qué no incluye el trabajo antes de empezar, y di que no la primera vez, no la quinta. Cada "ya que estás aquí" lleva precio y un sí por escrito, aunque sea chiquito.

El trabajo extra nunca llega en una sola petición grande. Llegan veinte chiquitas, y cada una suena razonable por sí sola. Mátalo desde el contrato. Escribe una lista de lo que sí incluye y otra de lo que no incluye. La de lo que no incluye es la que te salva: conectar electrodomésticos, tirar la cerca vieja, mover muebles, pintar techos, resanar donde el muchacho del cliente rompió algo. Si no está escrito, el cliente da por hecho que va incluido, y la verdad, ¿cómo no se lo va a imaginar? Luego aguanta desde el primer día. El primer "ya que estás aquí, nomás me..." marca el tono de toda la obra. No estás diciendo que no al trabajo. Estás diciendo que sí, con precio: "Claro que se puede. Hoy en la noche le paso el número." Esa frase convierte el favor en chamba. Cuida también lo chiquito. Diez minutos aquí y veinte allá se juntan en horas de cuadrilla que nadie está pagando. Apúntalas en una obra y ya no las ves igual. Y dile la misma regla a tu mayordomo. Mucho del trabajo regalado no lo promete el dueño; lo promete el foreman por quedar bien mientras tú andas en otra obra. Lo que tu contrato debe dejar claro en casa habitación cambia por estado, así que que un abogado o la junta de tu estado lea tu formato una vez.

Do I pay my subcontractors before the homeowner pays me?

Line your sub payments up behind your draws so you're not funding the job out of pocket. Pay subs after their work passes your walkthrough, and get a signed lien waiver before the check leaves your hand — waiver rules vary by state.

Your cash has to come in before it goes out, or you're financing somebody else's remodel. Set your sub payment schedule to sit just behind your draw schedule, and tell the sub that up front. Plenty of subs have worked that way their whole career. Before you release money, do three things. Walk their work yourself. Make sure it passed inspection where inspection applies. Get a lien waiver signed for the amount you're paying. No waiver, no check. Waiver forms and what they actually cover are different from state to state, so have an attorney set up the one you hand out. Never pay for work you haven't looked at, and never pay ahead on a promise. A deposit to a sub for special-order material is normal. A deposit for labor that hasn't started is how you lose a framer and your money in the same week. Two more to hand to a professional instead of guessing. Pay-when-paid and pay-if-paid clauses are treated differently from state to state, so have somebody read your sub agreement. And whether a helper is truly a subcontractor or is actually your employee is a legal and tax question. Ask your accountant. Getting that one wrong is expensive.

¿Le pago a mis subcontratistas antes de que el cliente me pague a mí?

Acomoda los pagos a tus subcontratistas detrás de tus pagos por avance para que no financies la obra de tu bolsa. Págales después de revisar su trabajo y pide el lien waiver firmado antes de soltar el cheque; las reglas cambian por estado.

El dinero tiene que entrar antes de salir, o andas financiando el remodelado de otro. Acomoda el calendario de pagos a tus subcontratistas justo detrás de tu calendario de avances, y díselos desde el principio. Un montón de subs ha trabajado así toda su vida y ni se saca de onda. Antes de soltar el dinero, tres cosas. Camina su trabajo tú mismo. Asegúrate de que pasó inspección donde aplica. Consigue el lien waiver firmado por el monto que le vas a pagar. Sin waiver, no hay cheque. Los formatos de waiver y lo que de veras cubren son distintos en cada estado, así que deja que un abogado te arme el que vas a usar. Nunca pagues trabajo que no has podido ver, y nunca pagues por adelantado sobre una promesa. Un anticipo a un sub para material de pedido especial es normal. Un anticipo por mano de obra que ni ha empezado es como pierdes al carpintero y el dinero la misma semana. Dos cosas más que hay que preguntarle a un profesional en lugar de adivinar. Las cláusulas de pay-when-paid y pay-if-paid se tratan distinto en cada estado, así que que alguien revise tu acuerdo con los subs. Y si un ayudante de verdad es subcontratista o en realidad es tu empleado es pregunta legal y de impuestos: pregúntale a tu contador. Equivocarte ahí sale caro.

How do I get an estimate back to a customer faster without underpricing the job?

Build a price book with your real unit numbers for the work you do every week, and quote off it while you're standing in the house. Guessing at your kitchen table at 9pm is where the money gets left on the floor.

Two things make estimates lose money: guessing, and waiting. Guessing gets fixed with a price book. Sit down one time and write your real unit prices for the work you do all the time. Per square foot of drywall hung and finished. Per door hung. Per linear foot of base. Per room painted two coats with normal prep. Build it off jobs you actually completed and what they actually cost you, not off what you wish they'd cost. Once that exists, bidding stops being a feeling and becomes counting. Waiting gets fixed by pricing at the house. Standing there you can see the ceiling height, the water stain, the crooked jamb, the stairs, where you're going to park. Three days later at the kitchen table all you have is a memory and a few photos, and memory always bids low. Two more habits worth having. Put prep and cleanup on the estimate as their own line items so nobody thinks they're free. And on any house with some age on it, carry a line for what you find behind the wall. That's not padding, that's pricing the risk you're the one taking. That's the workflow BuildPilot follows: walk the job, price it off your own price book, hand over the estimate before you leave.

¿Cómo le entrego el presupuesto más rápido al cliente sin cobrar de menos?

Arma tu propio libro de precios con tus números reales por unidad y cotiza parado en la casa. Adivinar en la mesa de la cocina a las nueve de la noche es donde se te queda el dinero.

Dos cosas hacen que un presupuesto pierda dinero: adivinar y tardarse. Lo de adivinar se arregla con un libro de precios. Siéntate una vez y escribe tus precios reales por unidad del trabajo que haces siempre. Por pie cuadrado de drywall colgado y terminado. Por puerta colgada. Por pie lineal de base. Por cuarto pintado a dos manos con la preparación normal. Sácalos de trabajos que de verdad terminaste y de lo que de verdad te costaron, no de lo que te hubiera gustado que costaran. Cuando eso existe, cotizar deja de ser corazonada y se vuelve contar. Lo de tardarse se arregla cotizando en la casa. Ahí parado ves la altura del techo, la mancha de agua, el marco chueco, las escaleras y dónde vas a estacionar la troca. Tres días después, en tu cocina, nomás tienes memoria y unas fotos, y la memoria siempre cotiza barato. Dos costumbres más. Pon la preparación y la limpieza como renglones aparte para que nadie crea que van de regalo. Y en casa con años, carga un renglón para lo que aparezca detrás de la pared. Eso no es inflar el precio, es cobrar el riesgo que tú estás tomando. Así trabaja BuildPilot: caminas la obra, la cotizas con tu propio libro de precios y entregas el estimado antes de irte.

Written by contractors, for contractorsHecho por contratistas, para contratistas

BuildPilot AI is a CRM built for the trades: walk the job and get a priced estimate before you leave, your own prices, and English and Spanish throughout. Photos save to the phone first when there is no signal. One flat price, unlimited crew.BuildPilot AI es un CRM hecho para los oficios: recorre el trabajo y sal con el estimado ya con precio, con tus propios precios, y todo en inglés y español. Las fotos se guardan primero en el teléfono cuando no hay señal. Un solo precio fijo, cuadrilla ilimitada.