Should I charge flat rate or hourly for HVAC service calls?

Flat rate works better for most residential HVAC work. You price the repair, not the clock, so a fast tech isn't punished. Hourly still fits commercial, unknown-scope, and long troubleshooting jobs. Plenty of shops run both.

Flat rate means you build a price book once and charge the same for the same repair every time. The customer hears one number before you start. No argument about how long it took. It also covers you when a twenty-minute job turns into two hours, because you already priced that risk in. To make it work you need real numbers behind it. Your parts cost. Truck cost. Drive time. Callbacks. What you need to clear after overhead and the tech's pay. Time a repair you do every week, add the parts, and work backward from there. Hourly still makes sense where nobody knows the scope: old rooftop units, chasing an intermittent fault, retrofit work in an attic full of surprises. Say up front that it's time and material, give a not-to-exceed number, and get that in writing before you open anything. Whichever way you go, be consistent. The fastest way to lose a customer is two techs off the same truck quoting the same repair two different ways. Keep the prices in one place the whole crew pulls from — BuildPilot lets you build your own price book so every man quotes the same.

¿Cobro precio fijo o por hora en una llamada de servicio de aire acondicionado?

El precio fijo funciona mejor en casas. Cobras la reparación, no el reloj, y el técnico rápido no sale castigado. Por hora todavía sirve en comercial, en trabajos sin alcance claro y en diagnósticos largos.

Con precio fijo armas tu lista de precios una vez y cobras lo mismo por la misma reparación siempre. El cliente escucha un número antes de que empieces. No hay pleito por cuánto te tardaste. Y te protege cuando un trabajo de veinte minutos se vuelve de dos horas, porque ese riesgo ya está en el precio. Para que funcione necesitas números de verdad atrás: costo de la refacción, costo de la troca, tiempo de camino, regresos, y lo que tienes que sacar limpio después de gastos y del sueldo del técnico. Toma el tiempo de una reparación que haces cada semana, súmale las partes y saca la cuenta al revés. Por hora sigue teniendo sentido cuando nadie sabe el alcance: unidades comerciales viejas, una falla intermitente, un retrofit en un ático lleno de sorpresas. Dilo desde el principio, da un tope máximo y déjalo por escrito antes de destapar nada. Como sea que lo hagas, sé parejo. Nada pierde un cliente más rápido que dos técnicos de la misma cuadrilla cotizando distinto. Ten los precios en un solo lugar del que jale toda la cuadrilla — en BuildPilot armas tu propia lista de precios.

Should I charge a diagnostic fee if the customer approves the repair?

Charge the diagnostic fee either way, and tell the customer the amount before you drive out. Some shops apply it to the repair if it's approved that day. That's a discount you chose to give, not free work.

Your diagnostic fee pays for the drive, the gauges, the meter, and the twenty years that let you find the fault in fifteen minutes. That has value whether or not they hire you to fix it. Say the number on the phone, before you roll: what the trip costs, that it covers finding the problem, and that any repair is quoted separately for approval before you touch it. Nobody argues about a price they already agreed to. If you want to apply it to the repair, do it on purpose and say it out loud: "The trip charge comes off if we do the work today." Show it on the invoice as a line item and then a credit line under it. If you just delete it, the customer never sees what you gave away. Two cases where you never waive it: second-opinion calls where somebody else already quoted, and warranty diagnosis on equipment you didn't install. And never quote a repair before you diagnose. A price guessed from the driveway is how you end up eating a compressor. Find the fault, take a photo of it, then give the number.

¿Cobro el diagnóstico si el cliente aprueba la reparación?

Cobra el diagnóstico de todos modos y di el precio por teléfono antes de salir. Si quieres, se lo descuentas cuando aprueban el trabajo el mismo día. Eso es un descuento que tú decides dar, no trabajo regalado.

El diagnóstico paga la gasolina, el camino, los manómetros, el multímetro y los veinte años que te dejan encontrar la falla en quince minutos. Eso vale, te contraten o no. Di el número por teléfono antes de salir: cuánto cuesta la visita, que cubre encontrar el problema, y que cualquier reparación se cotiza aparte y se aprueba antes de tocar nada. Nadie pelea por un precio que ya aceptó. Si lo quieres descontar cuando aprueban, hazlo a propósito y dilo en voz alta: "la visita se le descuenta si hacemos el trabajo hoy". Ponlo en la factura como su renglón y abajo el crédito. Si nomás lo borras, el cliente nunca ve lo que le regalaste. Dos casos donde no se perdona: segundas opiniones donde ya vino otro a cotizar, y diagnóstico de garantía en equipo que tú no instalaste. Y nunca cotices una reparación antes de diagnosticar. El precio adivinado desde la troca es como terminas comiéndote un compresor. Encuentra la falla, tómale foto, y luego das el número.

What EPA 608 certification do I need to buy refrigerant?

You need EPA Section 608 certification to buy or handle most refrigerants. Type I is small appliances, Type II is high-pressure equipment like split systems, Type III is low-pressure chillers. Universal covers all three. The certification does not expire.

Most residential and light commercial techs carry Type II or Universal. Universal costs a little more to test for and never leaves you standing at the supply house counter unable to buy a cylinder. Practical things that bite people: - The supply house wants a copy of your card on file. Keep one photo of it in your phone, one in the truck, and one in the office. Cards get lost; the certification itself doesn't expire. - Recover the refrigerant, don't vent it. That's the whole point of the rule. - Keep your own records of what you recovered and what you charged into a system, by address and date. When somebody asks two years later, the note in your phone is the answer. - Track your cylinders. Recovery tanks have their own rules on filling and disposal. - Larger systems have leak-repair requirements that small residential units don't. EPA rules change, and states and cities stack their own licensing on top — some require a state HVAC or contractor licence separate from 608, and some have their own refrigerant rules. That part varies by state. Check the EPA's current 608 guidance and your own state board before you assume the card is all you need.

¿Qué certificación EPA 608 necesito para comprar refrigerante?

Necesitas la certificación EPA Sección 608 para comprar o manejar casi todos los refrigerantes. Tipo I es equipo chico, Tipo II es alta presión como los splits, Tipo III son chillers de baja presión. La Universal cubre las tres y no se vence.

Casi todos los técnicos de casa y comercial ligero traen Tipo II o Universal. La Universal cuesta un poco más de examen, pero nunca te deja parado en el mostrador sin poder comprar un tanque. Lo que en la práctica sí te muerde: - La casa de refacciones quiere copia de tu tarjeta en el archivo. Ten una foto en el celular, otra en la troca y otra en la oficina. Las tarjetas se pierden; la certificación no se vence. - Recupera el refrigerante, no lo tires al aire. Para eso es la regla. - Lleva tu propio registro de cuánto recuperaste y cuánto cargaste en cada sistema, con dirección y fecha. Cuando te pregunten dos años después, esa nota es la respuesta. - Controla tus tanques de recuperación; tienen sus propias reglas de llenado y desecho. - Los sistemas grandes traen requisitos de reparación de fugas que los residenciales chicos no. Las reglas de la EPA cambian, y cada estado y ciudad pone su propia licencia encima. Eso varía por estado. Revisa la guía vigente de la EPA y el board de tu estado antes de dar por hecho que con la tarjeta basta.

Do I need a load calculation to replace an AC, or can I just match the old size?

Do the load calculation. The old unit's size only tells you what somebody sold years ago, not what the house needs. Windows, insulation, ductwork and additions change the number. Many places also require a Manual J with the permit — that varies by state.

Copying the old nameplate is how bad tonnage gets handed down for years. Plenty of houses got oversized the first time around, and now they've got new windows and attic insulation on top of it. Oversized equipment short cycles. It cools the air fast, never runs long enough to pull humidity, and the customer calls it "cold and clammy." Then you own that callback. Undersized runs forever and never satisfies on the hottest day of the year. What to actually do on a change-out: - Run the load. Measure the house, count the windows and their orientation, note insulation and any additions. - Check the ductwork before you pick the size. If the duct only moves the air for two and a half tons, a three-ton condenser is a lie. - Take a static pressure reading on the existing system. That one number tells you if you're about to install a good machine into a bad duct system. - Photograph the old data plate and the attic before you leave. If you truly have to match existing because of access or duct limits, write down why in the file. Permit and inspection requirements are local and vary by state, so call the building department before you order equipment.

¿Necesito hacer cálculo de carga para cambiar un aire, o le pongo el mismo tonelaje que traía?

Haz el cálculo de carga. El tonelaje viejo solo te dice lo que alguien vendió hace años, no lo que la casa necesita. Ventanas, aislamiento, ductos y ampliaciones cambian el número. En muchos lugares además piden el Manual J con el permiso; eso varía por estado.

Copiar la placa vieja es la manera en que un mal tonelaje se hereda por años. Muchas casas quedaron con equipo más grande de lo que necesitaban desde el principio, y encima ya les pusieron ventanas nuevas y aislamiento en el ático. Un equipo más grande de lo que pide la casa prende y apaga a cada rato. Enfría rápido, nunca corre lo suficiente para quitar la humedad, y el cliente dice que siente "frío pegajoso". Ese regreso lo pagas tú. Uno más chico de lo que pide corre todo el día y nunca llega el día más caliente del año. Qué hacer de verdad en un cambio de sistema: - Corre la carga. Mide la casa, cuenta ventanas y hacia dónde ven, revisa aislamiento y ampliaciones. - Revisa el ducto ANTES de escoger el tonelaje. Si el ducto solo mueve dos toneladas y media, poner tres es mentira. - Toma la presión estática del sistema actual. Ese número te dice si vas a meter buen equipo en mal ducto. - Tómale foto a la placa vieja y al ático antes de irte. Si de plano tienes que igualar por acceso o por ducto, deja anotado por qué. Permisos e inspección son locales y cambian por estado: habla al departamento de construcción antes de pedir el equipo.

What should I include in a quote for a full system change-out so I don't lose money?

Price the whole job, not the box. Equipment, line set, pad, whip, disconnect, drain and float switch, thermostat, permit, crane or attic access, haul-off, and start-up. Add real crew days for labor, and put your exclusions in writing.

The equipment is the easy part. What eats the profit is everything around it. Before you say a number, walk it and look at: - Duct transitions and plenum work to fit the new cabinet - Electrical: breaker size, disconnect, whip, and whether the panel can carry it - Line set — reuse or replace, plus the flush if the refrigerant type is changing - Condensate: new drain, trap, float switch, secondary pan - Access. Attic pull-down, crane, second story, tight crawl space - Permit, and the trip back to meet the inspector - Haul-off of the old equipment - Start-up, charge check, and the walkthrough with the homeowner Then write down what you are NOT doing. "Price does not include duct replacement, panel upgrade, or repairs to existing wiring." One line, and the change-order conversation gets a lot easier. Who pulls the permit and what it costs varies by state and city, so check with the local building department before you put a number on it. Give two or three options with the price next to each instead of one take-it-or-leave-it number, and hand it over before you leave the driveway. BuildPilot lets you walk the job and hand the customer a priced estimate before you pull out.

¿Qué debe llevar un presupuesto de cambio de sistema completo para no perder dinero?

Cotiza el trabajo completo, no la caja. Equipo, línea, base, whip, desconecte, drenaje y flotador, termostato, permiso, grúa o acceso al ático, retiro del equipo viejo y arranque. Suma los días reales de cuadrilla y deja por escrito lo que NO incluye.

El equipo es lo fácil. Lo que se come la ganancia es todo lo de alrededor. Antes de dar un número, camina la chamba y revisa: - Transiciones de ducto y plenum para que entre el gabinete nuevo - Eléctrico: breaker, desconecte, whip, y si el panel aguanta - Línea de refrigerante: se reusa o se cambia, más el lavado si cambia el tipo de refrigerante - Condensado: drenaje nuevo, trampa, flotador, charola secundaria - Acceso: escalera del ático, grúa, segundo piso, crawl space apretado - Permiso y el viaje de regreso para la inspección - Retiro del equipo viejo - Arranque, revisión de carga y explicarle al cliente cómo funciona Luego escribe lo que NO vas a hacer. "El precio no incluye cambio de ductos, panel eléctrico ni reparación del cableado existente." Un renglón, y la plática del cambio de orden se pone mucho más fácil. Quién saca el permiso y cuánto cuesta cambia por estado y por ciudad; pregunta en el departamento de construcción antes de poner el número. Da dos o tres opciones con su precio, no un solo número de tómalo o déjalo, y entrégalo antes de salir de la cochera. Con BuildPilot caminas el trabajo y entregas el estimado con precio antes de arrancar la troca.

How much deposit should I take on an HVAC install and when do I collect the rest?

Take a deposit big enough to cover the equipment when you order it, then collect the balance the day the system runs and you've walked the customer through it. Both amounts go on the signed proposal before you order anything.

You should never have your own money sitting in somebody's attic. The deposit covers the equipment and the material so you're not floating a distributor invoice on a credit card. A structure that works on a one or two day change-out: 1. Signed proposal with the deposit amount and the balance amount written on it. 2. Deposit collected before you order equipment. Not the morning of. 3. Balance due at completion — after start-up, after the customer sees it run, before your truck leaves. 4. Longer jobs (new ductwork, multi-system, commercial) get a progress payment in the middle. Say when payment is due out loud at the sale, not at the end. "Balance is due when we finish today" surprises nobody if they heard it a week earlier. Make it easy to pay you on the spot. On a phone in a driveway, whatever they already use beats whatever they have to sign up for. BuildPilot invoices show the customer how to pay you — Zelle, Venmo, Cash App, PayPal, check, or bank transfer — and BuildPilot never touches the money. Deposit limits on home improvement contracts vary by state, so check with your state board or your accountant before you set yours.

¿Cuánto anticipo cobro en una instalación de aire y cuándo cobro el resto?

Cobra un anticipo que alcance para el equipo cuando lo pidas, y el resto el mismo día que el sistema queda corriendo y ya le explicaste al cliente. Los dos montos van escritos en el presupuesto firmado antes de pedir nada.

Tu dinero no se queda en el ático de nadie. El anticipo cubre el equipo y el material para que no andes financiando la factura del distribuidor con la tarjeta. Una forma que funciona en un cambio de uno o dos días: 1. Presupuesto firmado con el anticipo y el saldo escritos. 2. Anticipo cobrado antes de pedir el equipo. No la mañana del trabajo. 3. Saldo al terminar: después del arranque, después de que el cliente lo ve correr, antes de que la troca se vaya. 4. Trabajos largos (ductos nuevos, varios sistemas, comercial) llevan un pago intermedio. Di cuándo se paga en la venta, no al final. "El saldo se paga el día que terminamos" no sorprende a nadie si lo oyó una semana antes. Y hazle fácil pagarte ahí mismo. En el celular, en la cochera, lo que el cliente ya usa gana contra lo que tiene que darse de alta. Las facturas de BuildPilot le muestran al cliente cómo pagarte — Zelle, Venmo, Cash App, PayPal, cheque o transferencia — y BuildPilot nunca toca el dinero. Los límites de anticipo en contratos de remodelación cambian por estado; consulta el board de tu estado o tu contador antes de fijar el tuyo.

What should I charge for an HVAC maintenance agreement and what do I include?

Price it off your real cost: two visits a year, the drive time, and the tech's hours, plus margin. Include the two tune-ups, filters if you supply them, priority scheduling, and a set discount on repairs. Put the checklist in writing.

Start from cost, not from what the guy down the road charges. Two visits, an hour to ninety minutes each, plus drive time, plus the filter, plus your overhead, plus margin. That's the floor. Then decide if you bill it once a year or monthly. Monthly is easier for the customer to say yes to and keeps something coming in during the slow months. What goes in the agreement: - Spring cooling visit and fall heating visit - The actual checklist, written down: coil condition, capacitor and contactor, amp draw, refrigerant pressures, drain and float switch, temperature split, safeties, heat exchanger inspection - Filters if you're supplying them, and the size - Front-of-the-line scheduling when it's the hottest week of the year - A stated repair discount and whether the trip charge is waived Never write "free repairs." Discounts, yes. Free, no. The tune-up is also where your reputation gets made or ruined. Show them what you found — photo of the pitted contactor, the meter reading on the weak capacitor — give the price, and let them decide. If the part reads in spec, say it reads in spec. A customer who feels pushed usually doesn't call back.

¿Cuánto cobro por un contrato de mantenimiento y qué incluyo?

Sácalo de tu costo real: dos visitas al año, el camino y las horas del técnico, más tu ganancia. Incluye los dos servicios, filtros si tú los pones, atención preferente y un descuento fijo en reparaciones. Deja la lista de revisión por escrito.

Empieza por tu costo, no por lo que cobra el de la otra cuadra. Dos visitas, de una hora a hora y media cada una, más el camino, más el filtro, más tus gastos, más ganancia. Ese es el piso. Luego decide si lo cobras una vez al año o mensual. Mensual es más fácil de aceptar y te deja algo entrando en los meses flojos. Qué lleva el contrato: - Visita de primavera para el aire y visita de otoño para la calefacción - La lista de revisión escrita: condición del serpentín, capacitor y contactor, amperaje, presiones, drenaje y flotador, diferencial de temperatura, seguridades, revisión del intercambiador - Filtros si tú los pones, con la medida - Atención primero cuando pega la semana más caliente del año - Un descuento fijo en reparaciones y si se perdona la visita Nunca escribas "reparaciones gratis". Descuentos sí; gratis no. El servicio de mantenimiento también es donde se hace o se quema tu fama. Enséñale lo que encontraste: foto del contactor quemado, la lectura del capacitor flojo, das el precio y él decide. Si la pieza lee bien, di que lee bien. El cliente que siente que le quisieron vender a fuerza casi nunca vuelve a llamar.

How long do I have to register the warranty on a new furnace after installation?

Most manufacturers give you a limited window after the install date to register, or the unit drops to the shorter base warranty. The deadline is set by that brand, so check the paperwork that came with the equipment.

Registration is the cheapest thing you'll do all week and the one that bites hardest when it's skipped. Miss the window and the homeowner gets the base warranty instead of the extended one. Years later that's your phone ringing, not the manufacturer's. Make it part of closing the job: - Photograph the data plate on every piece before you close the panel. Model and serial, readable. - Register the same day, from the driveway if you can. It takes minutes and the info is in your hand. - Use the homeowner's name and the correct install date. A registration under the wrong name is a fight later. - Save the confirmation number with the job file. - Give the customer a copy and tell them plainly what's covered and for how long. Remember the parts warranty is the manufacturer's, and the labor warranty is yours. Those are two different promises and customers mix them up constantly. Say out loud what your labor coverage is and for how long, and put it on the invoice. Deadlines and rules differ by brand and sometimes by distributor, so check the documents in the box rather than assuming it works like the last one.

¿Cuánto tiempo tengo para registrar la garantía de un calentón nuevo después de instalarlo?

Casi todos los fabricantes dan una ventana corta después de la fecha de instalación, o el equipo se queda con la garantía básica, que es más corta. El plazo lo pone la marca, así que revisa los papeles del equipo.

Registrar es lo más barato que vas a hacer en la semana y lo que más duele cuando se te pasa. Si se vence la ventana, el cliente se queda con la garantía básica en lugar de la extendida. Años después el teléfono que suena es el tuyo, no el del fabricante. Hazlo parte de cerrar el trabajo: - Tómale foto a la placa de datos de cada equipo antes de cerrar el panel. Modelo y serie, que se lean. - Registra el mismo día, desde la cochera si se puede. Son minutos y traes los datos en la mano. - Usa el nombre del dueño de la casa y la fecha correcta de instalación. Un registro a nombre equivocado es pleito después. - Guarda el número de confirmación en el archivo del trabajo. - Dale copia al cliente y explícale claro qué cubre y por cuánto tiempo. Acuérdate: la garantía de partes es del fabricante, la de mano de obra es tuya. Son dos promesas distintas y los clientes las confunden todo el tiempo. Di en voz alta cuánto cubres tú de mano de obra y ponlo en la factura. Los plazos cambian por marca y a veces por distribuidor; revisa los papeles de la caja en lugar de suponer que es igual que el anterior.

Written by contractors, for contractorsHecho por contratistas, para contratistas

BuildPilot AI is a CRM built for the trades: walk the job and get a priced estimate before you leave, your own prices, and English and Spanish throughout. Photos save to the phone first when there is no signal. One flat price, unlimited crew.BuildPilot AI es un CRM hecho para los oficios: recorre el trabajo y sal con el estimado ya con precio, con tus propios precios, y todo en inglés y español. Las fotos se guardan primero en el teléfono cuando no hay señal. Un solo precio fijo, cuadrilla ilimitada.